28/04/2022 作者 admin 关闭

Sichuan’s first ship pollutant receiving ship shipped shipbuilding pollutant full free fully received

Sichuan’s first ship pollutant receiving ship shipped shipbuilding pollutant full free fully received

Original title: Sichuan first ship pollutant receiving ship shipping ship pollutant full free receipts on July 30, the No. 3 berth of Zhangzhou Port, from Chongqing’s heavy wheel set 3019 is in the lifting container. Sichuan’s first ship pollutant receiving ship "Li Bihui No. 1" is close to the freighter, and several arms coarse contaminants absorbers and the wastewater on the freewor, under the action of the relevant equipment on the ship, put the garbage on the freighter , All contaminants such as sewage are all taken away.

  It is reported that after the trial operation of "Shui Water No. 1" was officially put into operation on July 26 after the test operation of more than half a year. After officially put into operation, the work on the Yangtze River channel has received 14 ships of domestic sewage cubic meters, 100 kg of solid garbage, and good operating state.

Next, "Li Bihui No. 1" will also be connected to the "ship E line" system network, transportation, ecological environment, urban management, and residential department can be connected to the Internet to see the closed-loop supervision of ship pollutants reception, transfer. Connect.

  "Shui Shui No. 1" started construction in August 2020, on October 15, the same year, in the Baizhen Tower Baita Bai Tower Bai Tasa, Hejiang County on October 15.

The total length of the ship is 32 meters, wide rice, deep rice, design and eating water, and the total power of the host is 352 kW. The ship is mainly used to collect domestic garbage, domestic sewage, oil water, etc., solid garbage compartment placed on the deck, and the solid garbage contained on the deck of the ship’s transport garbage, domestic sewage, oil water, etc., can load 20 tons of solid garbage. There is also a closed-life sewage chamber and oil sewage cabin on board, and capacity is 60 tons and 47 tons, respectively.

  According to the relevant person in charge of the Municipal Bureau of Aviation Administration, the official operation of "No. 1" pollutant receiving boat, complement the short board in the port ship pollution control of Zhangzhou City, will realize the ship’s contaminant along the Yangtze River "zero emissions, all Free, full reception ", enhanced the capacity of Luzhou port ship pollution control and ship anti-pollution treatment, to build an ecological barrier in the upper reaches of the Yangtze River, and promote the green development of the Yangtze River economy to make a solid foundation. (Liu Zhiyuan Luzhou Daily reporter Yan Yanshuang) (Editor: Zhang Hua Wei, Luo Wei) Share more people to see.